10.2 Locations of draining equipment
Figure 1. Yamarin 59 BR bilge pumps and
draining

1 |
Rainwater drainage through fitting | 5 | Bow rope box drainage through fitting |
2 |
Rainwater drainage shut-off valve | 6 | Manual bilge pump through fitting |
3 |
Rainwater drainage pipe | 7 | Rear plug |
4 |
Manual bilge pump | 8 | Shut-off flap |
The same locations apply to Yamarin 59 SC.